Programmable Musical Water Fountain Four Hue Line City Lake Night Show
Product Summary
Programmable Musical Fountain Four Hue Line City Lake Night Show This musical fountain runs one straight line of jets across a city basin: every column at the same height, colour split into four blocks, and a show file that runs dusk to closing. A Line Level From End To End A line reads as a line ...
Product Custom Attributes
programmable musical water fountain
,programmable musical dancing fountain
,lake musical water fountain
Basic Properties
Trading Properties
Product Description
Programmable Musical Fountain Four Hue Line City Lake Night Show
This musical fountain runs one straight line of jets across a city basin: every column at the same height, colour split into four blocks, and a show file that runs dusk to closing.
A Line Level From End To End
A line reads as a line only when every column matches. Spacing is drawn on the basin and repeated, so the row keeps one rhythm. Heights are trimmed wet, at night, against a mark on the far bank.
Four Colour Blocks On One Line
Colour is assigned in blocks, not per nozzle: four sections, each with its own address and cue. A warm block sits beside a cool one and holds the seam, because the change lives in the file, not the wiring.
Why A Lit Skyline Eats Your Colour
Colour is read as contrast, not output. A lamp that reads strong on dark water fades before lit towers, because contrast is a ratio, not a power figure: the column is judged against the backdrop. We meter that backdrop before fixing lamp counts, and hold palest scenes for the hour after sunset.
Files Travel, The Layout Does Not
A show file is portable: carry the cues to a second basin and timing, colour and zone names follow. Geometry does not travel: the nozzle map is redrawn per site and the file remapped before wet test.
Weeks Programmed, Nights Unattended
Schedules are written a month ahead: weekday loops, weekend sets, festival overrides. Staff start the evening from one panel, and drop a zone when a ceremony takes the square.
Buyer Briefing
Q: Two colours meet mid run. Will they bleed?
A: The seam is one nozzle apart and each lamp aims at its own column, so the edge stays clean from the bank. We photograph it at wet test.
Q: Five summers on, will the colour still match?
A: Lamps lose output slowly, so spares come from one batch and whole blocks are replaced, not single nozzles. Dimmed blocks are lifted in the file before each season; drivers and lamps carry one year, stainless steel three to five.
Q: Our operator leaves after the season. Who runs it next?
A: Shows saved under plain names; handover brings a one-page run sheet plus a walk through on the panel. A new operator opens the evening loop on day one.
Q: The run is long. How many feeds does it need?
A: Feeds split by zone, one cabinet per bank, with soft start so pumps do not hit the supply together. The count comes off the basin drawing.
Q: Our budget covers part of the run this year. Can we start short?
A: Yes. Blocks are independent, so a shorter line can be built first and extended along the same header later. Layout and quotation come off the basin plan, a deposit locks production, a wet test video follows, and the balance clears before crating in plywood wooden boxes from Guangzhou or Shenzhen.
Contact Our Experts And Get A Free Consultation!
Our mission is to offer "High Quality" & "Good Service" & "Fast Delivery" to help our clients to gain more profits.